GERT Networks and the Time- Oriented Evaluation of Projects by. Lecture notes in economics and mathematical systems , 172 : Operations research
6 Angebote vergleichen
Preise | 2013 | 2014 | 2015 | 2023 |
---|---|---|---|---|
Schnitt | € 74,35 | € 64,47 | € 58,29 | € 53,49 |
Nachfrage |
1
GERT Networks and the Time-Oriented Evaluation of Projects
DE PB NW
ISBN: 9783540097051 bzw. 3540097058, in Deutsch, Springer, Berlin, Taschenbuch, neu.
Lieferung aus: Deutschland, Versandkostenfrei.
buecher.de GmbH & Co. KG, [1].
Towards the end of the fifties methods for planning, scheduling,and control of proj ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network. In this association, the individual activities of the project correspond to the arcs, the so-called proj ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before hand, that every activity and every event are realized exactly once during the exe cution of the project, and that "feedback" (corresponding to cycles in the asso ciated network) is not permitted. Many projects, for example most R&D projects and projects in the area of production p 1 anni ng, do not SA ti sfy the foregoi ng res tri cti ons.268 p. 268 pp. 135 figs., 23 tabs. 244 mmVersandfertig in 3-5 Tagen, Softcover.
buecher.de GmbH & Co. KG, [1].
Towards the end of the fifties methods for planning, scheduling,and control of proj ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network. In this association, the individual activities of the project correspond to the arcs, the so-called proj ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before hand, that every activity and every event are realized exactly once during the exe cution of the project, and that "feedback" (corresponding to cycles in the asso ciated network) is not permitted. Many projects, for example most R&D projects and projects in the area of production p 1 anni ng, do not SA ti sfy the foregoi ng res tri cti ons.268 p. 268 pp. 135 figs., 23 tabs. 244 mmVersandfertig in 3-5 Tagen, Softcover.
2
GERT Networks and the Time-Oriented Evaluation of Projects
DE PB NW
ISBN: 9783540097051 bzw. 3540097058, in Deutsch, Springer, Berlin, Taschenbuch, neu.
Lieferung aus: Deutschland, Versandkostenfrei.
buecher.de GmbH & Co. KG, [1].
Towards the end of the fifties methods for planning, scheduling,and control of proj ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network. In this association, the individual activities of the project correspond to the arcs, the so-called proj ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before hand, that every activity and every event are realized exactly once during the exe cution of the project, and that "feedback" (corresponding to cycles in the asso ciated network) is not permitted. Many projects, for example most R&D projects and projects in the area of production p 1 anni ng, do not SA ti sfy the foregoi ng res tri cti ons.ii, 272 S. 268 pp. 135 figs., 23 tabs. 244 mmVersandfertig in 3-5 Tagen, Softcover.
buecher.de GmbH & Co. KG, [1].
Towards the end of the fifties methods for planning, scheduling,and control of proj ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network. In this association, the individual activities of the project correspond to the arcs, the so-called proj ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before hand, that every activity and every event are realized exactly once during the exe cution of the project, and that "feedback" (corresponding to cycles in the asso ciated network) is not permitted. Many projects, for example most R&D projects and projects in the area of production p 1 anni ng, do not SA ti sfy the foregoi ng res tri cti ons.ii, 272 S. 268 pp. 135 figs., 23 tabs. 244 mmVersandfertig in 3-5 Tagen, Softcover.
3
GERT Networks and the Time-Oriented Evaluation of Projects
~EN PB NW
ISBN: 9783540097051 bzw. 3540097058, vermutlich in Englisch, Springer Nature, Taschenbuch, neu.
Lieferung aus: Deutschland, Lagernd, zzgl. Versandkosten.
Towards the end of the fifties methods for planning, scheduling,and control of proj ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network. In this association, the individual activities of the project correspond to the arcs, the so-called proj ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before hand, that every activity and every event are realized exactly once during the exe cution of the project, and that "feedback" (corresponding to cycles in the asso ciated network) is not permitted. Many projects, for example most R&D projects and projects in the area of production p 1 anni ng, do not SA ti sfy the foregoi ng res tri cti ons. Soft cover.
Towards the end of the fifties methods for planning, scheduling,and control of proj ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network. In this association, the individual activities of the project correspond to the arcs, the so-called proj ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before hand, that every activity and every event are realized exactly once during the exe cution of the project, and that "feedback" (corresponding to cycles in the asso ciated network) is not permitted. Many projects, for example most R&D projects and projects in the area of production p 1 anni ng, do not SA ti sfy the foregoi ng res tri cti ons. Soft cover.
4
Symbolbild
Gert Networks the Time-Oriented Evaluation of Projects (2015)
DE PB NW
ISBN: 9783540097051 bzw. 3540097058, in Deutsch, SPRINGER VERLAG GMBH 01/04/2015, Taschenbuch, neu.
Von Händler/Antiquariat, Books2Anywhere [190245], Swindon, United Kingdom.
New Book. Shipped from UK in 4 to 14 days. Established seller since 2000. This item is printed on demand.
New Book. Shipped from UK in 4 to 14 days. Established seller since 2000. This item is printed on demand.
5
Symbolbild
Gert Networks and the Time-Oriented Evaluation of Projects
DE PB NW
ISBN: 9783540097051 bzw. 3540097058, in Deutsch, Springer, Taschenbuch, neu.
Von Händler/Antiquariat, BuySomeBooks [52360437], Las Vegas, NV, U.S.A.
This item is printed on demand. Paperback. 276 pages. This item ships from La Vergne,TN.
This item is printed on demand. Paperback. 276 pages. This item ships from La Vergne,TN.
6
Symbolbild
GERT Networks and the Time- Oriented Evaluation of Projects [Taschenbuch] by., Ulrich Steinhardt, Lecture notes in economics and mathematical systems , 172 : Operations research (1979)
DE PB US
ISBN: 9783540097051 bzw. 3540097058, in Deutsch, Berlin, Heidelberg, New York : Springer, Taschenbuch, gebraucht.
Von Händler/Antiquariat, Mosakowski & Stiasny GbR [51070922], Florstadt, Germany.
Die Beschreibung dieses Angebotes ist von geringer Qualität oder in einer Fremdsprache. Trotzdem anzeigen
Die Beschreibung dieses Angebotes ist von geringer Qualität oder in einer Fremdsprache. Trotzdem anzeigen
Lade…