Concrete structure construction rebar arrangement rules and structure Detailing (independent foundation. strip foundation. raft foundation. pile cap) (12G901-3)(Chinese Edition)
Ein Angebot gefunden

Bester Preis: 85,92 (vom 19.03.2022)
Aus dem Archiv:
1
ZHONG GUO JIAN ZHU BIAO ZHUN SHE JI YAN JIU YUAN

Concrete structure construction rebar arrangement rules and structure Detailing (independent foundation. strip foundation. raft foundation. pile cap) (12G901-3)(Chinese Edition) (2012)

Lieferung erfolgt aus/von: China, Volksrepublik ~EN PB NW

ISBN: 9787802427914 bzw. 7802427916, vermutlich in Englisch, Taschenbuch, neu.

85,92 ($ 94,58)¹ + Versand: 9,08 ($ 10,00)¹ = 95,00 ($ 104,58)¹
unverbindlich
Lieferung aus: China, Volksrepublik, Versandkosten nach: DEU.
Von Händler/Antiquariat, BookerStudy.
paperback. New. Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.Paperback. Pub Date: 2012 Pages: 96 Language: Chinese Publisher: China Planning Press concrete structure construction rebar arrangement rules and structure Detailing (independent foundation. strip foundation. raft foundation. pile cap) (12G901-3) 11G101-3 concrete construction drawing plane as a whole represents a method of mapping rules and structure Detailing (independent foundation. strip foundation. raft foundations and pile caps) Atlas constructed contents. construction when reinforcement arrangement constructed deep design. Atlas construction personnel to guide the design of reinforced construction arrangement. calculation and on-site installation of reinforced turned like lashing ensure that the construction of reinforced standardized and orderly arrangement. so that the actual construction built to meet the specification and design requirements. and assist designers reasonable organic convergence of the structure plan selection. Design and Construction construction. and comprehensive assurance engineering design and construction quality. Contents: general structural requirements anchorage and connection reinforcement of the thickness of the protective layer of concrete and concrete structures of the environment category reinforced hooks and bending stirrups. stretch hook structure and longitudinal reinforcement lap banding arranged in vertical cross-section reinforced cataloging the reinforcement spacing column Reinforcing the foundation anchor wall plug tendons in basic anchor base beam cross-section stirrups install lashing position requires basic beam cross-section longitudinal reinforcement and stirrup arrangement to construct a separate basis for an independent foundation DJj. DJp. BJ1 independent reinforced arrangement tectonic cup. Double Column ordinary BJp backplane reinforced arrangement structure independent of the base at the bottom and top of the reinforced tectonic setting of the arrangement of the foundation beam double column ordinary independent foundation rebar arrangement constructed the independent foundation slab reinforcement length shortened 10% foundation BJj BJp reinforced arranged to construct the double cup port independent foundation BJj of arrangement of structural high BJp reinforced cup independent foundation BJj of the structure of BJp reinforced arrangement dual cup independent foundation BJj of arrangement constructed single column of BJp reinforced ordinary independent deep the strip foundation slab arrangement structure of the basis of short columns reinforced double column ordinary independent deep foundation short column reinforced arrangement constructed strip foundation and raft foundation walls by the arrangement of the reinforced structural beam the strip foundation slab by reinforced row cloth the constructor strip foundation slab is not flat floor reinforcement arrangement constructed foundation beam longitudinal reinforcement connection position foundation beam stirrups. stretching along the beam longitudinal rows overlapping area of "the fabric structure foundation beam longitudinal reinforcement stirrup arrangement constructed foundation beams JL end extended parts of reinforced the arrangement constructed foundation beams few end overhang reinforcement arrangement construct the basis of secondary beams JCL ends overhanging parts reinforced arrangement constructed foundation secondary beam JCL end overhang reinforcement arrangement constructed foundation beams top calm bottom usually reinforced arrangement constructed foundation beams only reinforced arrangement structure bearing reinforced arrangement constructed foundation beam beam top beam bottom height difference when there is a height difference when reinforced arrangement constructed foundation beam beam bottom elevation difference beam top on both sides of the foundation beam width is not reinforced arrangement constructed the basis of the primary beam and column haunched reinforced arrangement constructed foundation times Ministry side axillary reinforced construct the basis of the arrangement of the main beam beam beam beam haunched reinforced arrangement construct the basis of the main beam the basic secondary beam connection location at the intersection of the additional transverse reinforcement arrangement constructed foundation beams intersect area stirrup arrangement constructed beam slab raft foundation slab reinforced beam-slab raft foundation slab longitudinal reinforcement arrangement structure beam-slab raft foundations Tablet extended end Ministry of reinforced arrangement constructed beam-slab raft foundations tablet overhanging ends and slab variable cross-section parts reinforced the arrangement constructed beam-slab raft foundations tablet becomes the sectional portion reinforced arrangement of structural columns the board with ZXB and the midspan board with KZB reinforced overhang arrangement construct a flatbed the raft foundations tablet BPB reinforced arrangement constructed flatbed raft foundation plate (ZXD. KZD. BPB) overhanging parts reinforced arrangement structure flatbed raft foundation plate (ZXD. KZD. BPB) edge and flat top surface does not usually reinforced arrangement constructed flatbed raft foundation plate (ZXD. KZD. BPB) end injustice and top. the bottom not usually constructed of reinforced arrangement flatbed raft base plate (ZXD KZD. BPB) Edge reinforced arrangement constructed pile capping rectangular Order of the stepped-section CTj backplane reinforced rectangular pile cap arrangement structure the single stage the cross section CTj backplane reinforced rectangular arrangement structure Caps sloping section CTp backplane reinforced arrangement constructed equilateral the pile caps cT reinforced arrangement constructed isosceles arrangement structure of three the cap CTj reinforced hexagonal Order of the station CTr reinforced arrangement constructed single-row pile cap beam CTL Reinforced arrangement constructed double row pile cap beam CTL reinforced arrangement connection structure of the tectonic pile cap. raft constructed foundation contact basis for basic contact beam. beam JLL longitudinal reinforcement arrangement structure and associated framework column stirrup arrangement structure ... Satisfaction guaranteed,or money back.
Daten vom 19.03.2022 12:21h
ISBN (andere Schreibweisen): 7-80242-791-6, 978-7-80242-791-4
Zuerst gefunden: 19.03.2022 12:21:11
Zuletzt gefunden: 20.04.2022 03:34:03
Kleinster Preis: 85,92 (vom 19.03.2022 12:21:11)
Höchster Preis: 85,92 (vom 19.03.2022 12:21:11)
Fundstellen insgesamt: 1

Momentan keine Suchergebnisse - vielleicht bald lieferbar

Ihre Suche nach ist bei mehr als 100 angebundenen Webshops momentan nicht lieferbar. Wir finden dieses Buch aber trotzdem innerhalb weniger Wochen.

Sie Suchen nach diesem Buch:
ZHONG GUO JIAN ZHU BIAO ZHUN SHE JI YAN JIU YUAN: Concrete structure construction rebar arrangement rules and structure Detailing (independent foundation. strip foundation. raft foundation. pile cap) (12G901-3)(Chinese Edition)
ISBN: 9787802427914

Speichern Sie diese Suche kostenlos in ab, dann werden Sie automatisch benachrichtigt, sobald dieses Buch verfügbar ist. Meistens finden wir dieses Buch innerhalb weniger Wochen und verständigen Sie dann per E-Mail. Sie können dann frei entscheiden, ob Sie das Buch kaufen wollen oder nicht.

Unsere Suchtipps für Ihre Suche:

Sie haben jetzt folgende Möglichkeiten:

  • Speichern Sie diese Seite in Ihren Lesezeichen oder Favoriten ab, dann können Sie jederzeit die Suche erneut ausführen.
  • Das Buch ist tatsächlich derzeit vergriffen bzw. nicht lieferbar. Es ist z.B. eine Rarität. Möglicherweise ist es aber in einiger Zeit lieferbar. Speichern Sie dazu diese Suche kostenlos ab oder lassen Sie sich kostenlos auf dieses Gerät benachrichten und Sie werden automatisch per E-Mail oder Nachricht informiert, sobald dieses Buch wieder lieferbar wird. Wir sind zuversichtlich, dass wir jedes Buch auf diese Weise innerhalb relativ kurzer Zeit finden. Probieren Sie es einfach aus!

Anmeldung mit Google:

ODER

Anmeldung mit Facebook:

Mit Facebook anmelden oder registrieren

Lade…